Type of project:
individual
Location: Russia, Saratov
Equipment: HDL BusPro
Control of Drawn-in and Exhaust Ventilation System
(“ASTRA-Sar” Ltd.)
Tasks set by the client in the project:
The task was to control the ventilation system in two offices from mobile devices via WiFi.
Control of ventilation system with a capability to control working parameters and emergencies:
- changing settings including the rotation speed of ventilation electric motors;
- saving changes in the system state in the log;
- realization of reliable restart of the system after failures.
Control panels:
- iPad 9.7" Retina 16Gb Wi-Fi - 2
- iPad mini 16Gb Wi-Fi - 1
Equipment of the project:
- Segnetics Pixel
- Vesper E2-mini
- HDL-Bus Pro
Photos